CEMEX helps to prevent pollution in biggest sewage project in UK - CEMEX helps to prevent pollution in biggest sewage project in UK
Press Releases
publishDate1 Wed, 20 Jan 2021 21:01:00 +0000
publishDate2 Jan 20, 2021 9:01:00 PM
publishDate3 January 20, 2021
January 20, 2021
CEMEX, S.A.B. de C.V. (“CEMEX”) (NYSE: CX) announced today that it is supplying over 40,000 tons of a lining sprayed concrete for the construction of the Thames Tideway Tunnel, the biggest infrastructure project ever undertaken by the UK water industry.
The Tunnel is being built to upgrade London’s sewer system to cope with its growing population. Currently, London relies on a 150-year-old sewer system built for a population of less than half its current size. As a result, during periods of heavy rain, the current infrastructure can become overwhelmed.
CEMEX supplies over 40,000 tons of concrete for the construction of the Thames Tideway Tunnel, the biggest infrastructure project ever undertaken by the UK water industry.
The new 25KM tunnel will intercept, store and transfer sewage waste away from the River Thames. Starting in Acton, west London, the Tunnel will travel through the heart of London at depths of between 30 and 60 meters, using gravity to transfer waste eastwards and be processed and dealt with in a modern state-of-the-art facility.
CEMEX’s primary lining spray concrete is being used for the shafts and launch tunnels in the central part of the project – a 12.5KM stretch of the tunnel moving under central London, which is being constructed by a joint venture between Ferrovial Construction and Laing O’Rourke. The concrete is sprayed from bottom to top in one continuous operation until the shaft wall is complete. An overly sophisticated mix is required, consisting of eight separate constituents which, when combined, give ultra-high strength, consistency, and workability retention of two hours.
CEMEX supplies over 40,000 tons of concrete for the construction of the Thames Tideway Tunnel, the biggest infrastructure project ever undertaken by the UK water industry.
When sprayed, it has to adhere to the tunnel or shaft wall / ceiling and gain strength immediately to a very high strength gain requirement. The concrete also needs to be highly pumpable, in some cases with a pipeline length of up to 400 meters.
“The Thames Tideway Tunnel project is one of incredible scale which will solve serious capacity issues with London’s sewer system and have considerable benefits for the area’s wildlife and population, while also preventing pollution, creating jobs, a rejuvenated river economy and new areas of public space,” said Sergio Menendez, President of CEMEX Europe, Middle East, Africa & Asia. “This is a remarkable piece of engineering, and we’re proud to be working with world-class contractors to build this key infrastructure in the most sustainable and cost-effective way possible for one of the world’s greatest cities.”
CEMEX manufactures the product at its dedicated Spray Concrete plant in Buxton, from where it is transported into central London at rates that peak at around 3,000 tons per month. Supply is likely to continue for a few months, although this may need to be extended due to the Coronavirus pandemic’s impact.
CEMEX supplies over 40,000 tons of concrete for the construction of the Thames Tideway Tunnel, the biggest infrastructure project ever undertaken by the UK water industry.
CEMEX is a global building materials company that provides high quality products and reliable services. CEMEX has a rich history of improving the wellbeing of those it serves through innovative building solutions, efficiency advancements, and efforts to promote a sustainable future. For more information on CEMEX, please visit: www.cemex.com
###
CEMEX assumes no obligation to update or correct the information contained in this press release. This press release contains forward-looking statements within the meaning of the U.S. federal securities laws. CEMEX intends these forward-looking statements to be covered by the safe harbor provisions for forward-looking statements in the U.S. federal securities laws. These forward-looking statements reflect CEMEX’s current expectations and projections about future events based on CEMEX’s knowledge of present facts and circumstances and assumptions about future events, as well as CEMEX’s current plans based on such facts and circumstances. These statements necessarily involve risks and uncertainties that could cause actual results to differ materially from CEMEX’s expectations. The content of this press release is for informational purposes only, and you should not construe any such information or other material as legal, tax, investment, financial, or other advice. CEMEX is not responsible for the content of any third-party website or webpage referenced to or accessible through this press release.
CONTACT INFORMATION | |
---|---|
Media Relations Jorge Pérez |
Investor Relations Lucy Rodríguez |